Two bridge deck superstructures have been successfully installed on the south side of the Metro North Atlantic Street Bridge.  Special Self Propelled Modular Transporters hauled the pre-constructed spans which had been staged right next to the south side of the bridge.  Work progresses to install new rail on these spans with 4 spans for the North side of the bridge scheduled to be installed on July 4 and 6th.

print